Skip to content

Proudly American | Family owned

Same-day service available

(352) 675-6376 Book Online

Chimney chase cover replacement in Carver Shores

A chase cover made to your Carver Shores chimney's measurements and sloped to shed rain. Free inspection and a written price from our family-owned team.

  • Licensed & insured
  • Locally run
  • Family owned and operated
  • Same-day service available
4.8 out of 5 from 736 reviews
  • Google
  • Yelp
  • Facebook

How we price chase covers in Carver Shores

  1. Chase measured over the finished siding on all four sides
  2. Cross-breaks or a pitched top that drains to the edges
  3. Open gap at the pipe kept as the manual directs
  4. Skirt depth sized to clear the wall finish

How a new chase cover keeps Carver Shores chases dry

The small gap left open at the pipe

A careful installer does not seal the chimney pipe tight to the cover. Manufacturer manuals call for a small open gap between pipe and collar, and one warns in plain terms against caulking the pipe to the chase top collar. The storm collar then covers that gap from above. Filling it with sealant works against how the system was designed to handle heat. When we find the pipe glued to an old cover in Carver Shores, the estimate says so and the new top restores the gap.

Copper covers and metal compatibility

Copper chase covers are chosen mostly for appearance, and they weather from bright metal toward brown and eventually green. Copper should not touch or drain onto galvanized parts, because the zinc coating is used up faster in contact with other metals, as the American Galvanizers Association explains. If copper is your choice, we check what it will touch, including the storm collar, flashing and fasteners, and specify compatible parts so the upgrade does not shorten the life of its neighbors.

Laying out a cover for two chimney pipes

Some chases carry two chimney pipes, such as two fireplaces on different floors. Each pipe needs its own collar at its measured center, and the cover has to drain away from both. One manufacturer suggests terminations in a shared chase sit at least twenty-four inches apart center to center, at staggered heights. We measure each pipe's position on the old top and confirm the spacing before fabrication so the new openings line up with the pipes. The drainage has to work between the two collars as well, so water never pools in the space that separates them.

Buckling from heat and sun

Large flat sheets of metal expand in the sun and contract as they cool. A thin, flat cover can buckle or pop as it moves, a condition sheet metal workers call oil canning, and the buckled areas tend to hold water. Cross-breaks or a fabricated pitch stiffen the sheet so it moves less, and a suitable thickness keeps its shape. We size the shape and the material to the width of your chase. The popping noise many owners hear on hot afternoons often stops once the new, stiffer cover is in place.

What Carver Shores owners ask about chase covers

How long does chase cover replacement take?

It usually takes two visits. We measure at the free inspection, the cover is fabricated to those measurements, and installation follows once it is ready. You get a timeline when you approve the work.

How does the 72-hour discount work?

Book any service within 72 hours after your free inspection and 10% comes off. We write the discount into your estimate, so the price you approve already includes it.

Request your free estimate

Share the job details and arrange a free inspection with our local team.

  • Free inspection
  • No hidden fees
  • Family owned and operated

Need an answer now? Call (352) 675-6376

Tell us what needs attention. We will contact you to arrange your free inspection.

Call(352) 675-6376